Refrigerants are not harmful to the environment until they are released into it. That’s most likely to occur during installation, maintenance, and removal. Hire a contractor that uses best-practice refrigerant management techniques to minimize leakage rates during operations and when installing new or removing old equipment.
Although not required for credit compliance, developing a plan to monitor the performance of lighting control systems is recommended. This may include occupant survey feedback (EAc5), ongoing monitoring (EAc3), and a schedule for regular testing of components.
Although not required for credit compliance, developing a plan to monitor the performance of lighting control systems is recommended. This may include occupant survey feedback (IEQc7.2), ongoing monitoring (EAc5), and a schedule for regular testing of components.
See the Operations and Maintenance section of the Reference Guide or LEED-EBOM for guidance on continued purchasing and replacement of Energy Star equipment after initial project specification. Work this guidance into procurement policies for future purchases.