Specify signage for water strategies that may require special instructions for use. This may include occupant signage for operating dual-flush toilets, indicating non-potable water, and operational signage for distinguishing pipes carrying reused water.
For Core and Shell buildings, project teams must use a feasible tenant layout and plan to demonstrate that it meets the credit requirements. A consistent and appropriate occupancy must be used across credits.
Total the areas of regularly occupied spaces that have both direct-line-of-sight to perimeter glazing and access to views while seated (at 42”). Divide this value by the total area of regularly occupied spaces to confirm if the design provides greater than 90% of occupied areas with access to views. This is done in the LEED credit form. Upload plans to LEED Online.