Stagger equipment training to allow staff to become familiar with the systems. Make sure that this is reflected in contracts because typically the training is scheduled for same time to reduce the contractor’s presence on site. This stagger might de

Stagger equipment training to allow staff to become familiar with the systems. Make sure that this is reflected in contracts because typically the training is scheduled for same time to reduce the contractor’s presence on site. This stagger might delay the payment to the contractor and conflict with the contract, but provides the owner with a conformation of smooth operation

The CxA develops commissioning report including all testing and observations. A Commissioning Report is the final deliverable for the commissioning prerequisite. It lists all the activities carried out, testing results and recommendations. The CxA is avai

The CxA develops commissioning report including all testing and observations. A Commissioning Report is the final deliverable for the commissioning prerequisite. It lists all the activities carried out, testing results and recommendations. The CxA is available for a final meeting and to discuss all recommendations for clarifications.

Enhanced commissioning extends into the system startup phase, bridging the gap between design into the operations hand-over. Design and installation is only the first part of running an energy-efficient building. The real benefits are realized during oper

Enhanced commissioning extends into the system startup phase, bridging the gap between design into the operations hand-over. Design and installation is only the first part of running an energy-efficient building. The real benefits are realized during operation. The CxA provides a common link between the design team, installation contractors, and the operations team, providing added value at all steps of the process.