Enhanced commissioning extends into the system startup phase, bridging the gap between design into the operations hand-over. Design and installation is only the first part of running an energy-efficient building. The real benefits are realized during operation. The CxA provides a common link between the design team, installation contractors, and the operations team, providing added value at all steps of the process.