ad-100000968

Revise the text for "Building footprint" to be "Building footprint is the area on a project site used by the building structure, defined by the perimeter of the building plan. Parking lots, parking garages, landscapes, and other nonbuilding facilities are not included in the building footprint."

ad-100000966

Revise the text for "Building footprint" to be "Building footprint is the area on a project site used by the building structure, defined by the perimeter of the building plan. Parking lots, parking garages, landscapes, and other nonbuilding facilities are not included in the building footprint."

100001844

Step-by-step, replace step 4 with the following:
"Step 4. Select implementation approach (E)
• Determine whether integrated pest management will be handled in-house, with contracted services, or a combination of both.
• If handled in-house, ensure those who will perform the work are licensed or trained in accordance with local standards (refer to the Association of Structural Pest Control Officials).
• If handled through contracted services, select contractors that are certified by one of the following third parties: GreenPro, EcoWise, or GreenShield.

100001841

Change the fifth paragraph so it reads: “Powered floor maintenance equipment must have vacuums, guards, or other devices for capturing fine particles, and must operate with a maximum level of 70 dBA, in accordance with ISO 11201."

100001840

Replace as follows:
Environmental Choice CCD-110 with UL EcoLogo 2792
Environmental Choice CCD-146 with UL EcoLogo 2759
Environmental Choice CCD-148 with UL EcoLogo 2795
Environmental Choice CCD-147 with UL EcoLogo 2777
Environmental Choice CCD-112 with UL EcoLogo 2798
Environmental Choice CCD-113 with UL EcoLogo 2791
Environmental Choice CCD-115 with UL EcoLogo 2796
Environmental Choice CCD-082 with UL EcoLogo 175
Environmental Choice CCD-086 with UL EcoLogo 175
Environmental Choice CCD-104 with UL EcoLogo 2784