100001950

Replace the Calculations section with the following:
The land use runoff coefficients for small rainfall depths in the Small Storm Hydrology Method are recommended (runoff coefficients express the fraction of rainfall which is converted into runoff). The project team may choose the runoff volume calculation methodology most appropriate for the project, provided sufficient documentation and justification to demonstrate that the intent of the credit is being met.

100001951

Revise the Green Infrastructure and Low-Impact Development Strategies section to read:
The goal of low impact development is to manage water as close to the source as possible using soil and vegetation-based systems. In addition to mimicking natural hydrologic cycle processes, green infrastructure and low-impact development help integrate the site with the surrounding watershed, are appropriate to the local ecosystem and climate, and deliver such other benefits as water reuse, habitat creation, and species diversity.

100001949

Replace the Step-by-Step Guidance section with the following:
Select the appropriate option and path (if applicable) for the project. First investigate data sources for natural land cover conditions, and choose Option 1 if information is not available.

100001947

Delete the paragraph that begins with "The project is a 10 story building..." Add "Example 1." above the example site plan.

Replace Figure 1 with an updated graphic that shows revised numbers in the legend.

In Table 1. Example percentiles of rainfall events, change the first column heading to read "Rainfall amount" and the second column heading to read "Percentile of rainfall events".

100001948

Delete the paragraph that begins with "The new construction project is a 10 story building..." Add "Example 1" above the example site plan.

Rename Table 1. to "Example percentiles of rainfall events" and change the first column heading to read "Rainfall amount" and the second column heading to read "Percentile of rainfall events".

100002310 Material Ingredient pathway GG TAG and LBC program information

Modify the title of the section to read as: "Declare and Living Product Challenge labels"

Edit the first sentence of the first paragraph to read as follows: "Declare and Living Product Challenge labels are issued by..."

Edit the sixth sentence in the second paragraph to read as follows: "For example, some products that utilize Temporary Exception I10-E4 may withhold some proprietary ingredient information of up to 1% of product ingredients (therefore not meeting the LEED disclosure threshold), while some other LBC..."