Delete the paragraph that begins with "The new construction project is a 10 story building..." Add "Example 1" above the example site plan.

Rename Table 1. to "Example percentiles of rainfall events" and change the first column heading to read "Rainfall amount" and the second column heading to read "Percentile of rainfall events".

Below Table 1 and above the sample documentation narrative, change the paragraphs to read:
To supplement the capacity of the pervious landscaped area, the project team has identified several conceptual GI and LID measures- bioretention areas, porous paving, a rain garden, and pervious decking- to capture rainwater from impervious surfaces. To ensure that the designed site manages all the rainwater runoff generated during the 95th percentile storm, the team calculates how the GI and LID measures manage the runoff, and it is verified that all required runoff is managed on site.

Delete Table 2. Example summary table

The last sentence of the Sample documentation narrative describing GI and LID measures should read:
"The area of bioretention in this project meets the 95th percentile criteria, managing rainwater runoff via natural processes."

Add a section called "Example 2." that reads:
Example 2 follows a project located in Maryland that attempted Option 1, Percentile of Rainfall Events. It gives an overview of the project, and then details the iterative rainwater management design process and calculations used to achieve the credit requirements. It is broken into two modules, both of which are located in the web-based reference guide on the right side of the “Guide” page.