It’s not only about recycling

This credit focuses on diverting waste from landfills by finding multiple alternatives for end uses of the waste, namely recycling, reuse on site, donation for reuse on another site, or resale. All of these diversion methods count towards credit compliance—50% construction waste diverted for one point, 75% for two points.

Look for opportunities to prevent the generation of waste on construction sites because the less waste you generate, the less you have to recycle or reuse to earn the credit.

The Greening of a Children's Museum

by
The Boston Children's Museum expansion and renovation was designed to enhance the building's connections to its urban waterfront site, guided by a desire to build environmental education opportunities into the design.
Read more »

Less is more

This credit is meant to reduce the number of cars on the road and limit the sprawl of parking facilities. It also helps encourage carpooling and reduce transportation-related environmental impacts like emissions, stormwater runoff, and the urban heat island effect.

You have three options to earn this credit:

This credit only works for the right kind of project

If salvaged materials are appropriate for your project, this credit should be easy enough to achieve. But you have to use a lot of salvaged materials to reach the threshold, so it's most feasible for small projects that target sources of salvaged materials early in the design process. Even then, it can be tricky because these are not the sort of things you can specify and count on being able to order from a supplier--the contractor or owner usually has to procure and stockpile salvaged items when they become available.