ad-100000594
Percentage waste Percentage diverted1 00.88 0.130.75 0.250.63 0.380.5 0.50.38 0.630.25 0.750.13 0.88change to:Percentage waste Percentage diverted1 00.875 0.1250.75 0.250.625 0.3750.5 0.50.375 0.6250.25 0.750.125 0.875
Percentage waste Percentage diverted1 00.88 0.130.75 0.250.63 0.380.5 0.50.38 0.630.25 0.750.13 0.88change to:Percentage waste Percentage diverted1 00.875 0.1250.75 0.250.625 0.3750.5 0.50.375 0.6250.25 0.750.125 0.875
Replace the text with "Biofuel-based electrical and thermal systems (see list of eligible biofuels, below)."
In the first paragraph, remove the last sentence, "Tenants who leasetheir space or do not occupy the entire building are eligible."
Remove the entire text of item 3
In the second line of the second paragraph, replace remainder of the paragraph starting with "However" with the text "However, all performance periods must overlap and terminate within 30 calendar days of each other, as illustrated in Table 1. In this example, each performance period is at least 3 months, and the termination dates range from April 1 through April 26."
Remove the text of the section and replace with new text as indicated in the supplemental documentation.
In the fourth line, replace "Credit 2 Sustainable Purchasing - Durable Goods" with "Credit 2.1 Sustainable Purchasing - Electric-Powered Equipment" and, in a new line below, "Credit 2.2 Sustainable Purchasing - Furniture;" both lines end in "259" as the page number
In the fifth line, replace "Credit 4 Cooling Tower Water Management" with "Credit 4.1 Cooling Tower Water Management - Chemical Management" and, in a new line below, "Credit 4.2 Cooling Tower Water Management - Nonpotable Water Use;" both lines end in "115" as the page number
Insert the term "Tenant space" in alphabetical order with the accompanying text "Tenant space is the area within the LEED project boundary. For more information on what can and must be in the LEED project boundary see the Minimum Program Requirements (MPRs) and LEED 2009 MPR Supplemental Guidance. Note: tenant space is the same as project space."
In the seventh row of the table in the "Flow Rate" column, replace "1.8 gpm" with "? 2.0 gpm"