Skip to main content

You are currently logged in under an enterprise account

Before making a purchase, you'll need to login to your personal profile or create one now.

Home
Go to BuildingGreen.com
  • Go to BuildingGreen.com
Top navigation
  • About
  • CEUs
  • Exam Prep
  • Reports
  • FAQ
  • Pricing
  • Support
Menu user
  • Login
Home
Main navigation
  • LEED Credits
  • Forum
  • Blog
  • Tip sheets

Firm or campus member?

Please log in using your personal profile:
Log in »   Create personal profile »
You’re Already Subscribed

You're already enjoying full Premium access. No need to subscribe again.

The design team completes the LEED Online documentation, signing off on compliance with the applicable AEDG, and writing the narrative report on the design approach and key highlights.

Submitted by on
  • Read more about The design team completes the LEED Online documentation, signing off on compliance with the applicable AEDG, and writing the narrative report on the design approach and key highlights.

The design team completes the LEED Online documentation, signing off on compliance with the applicable AEDG, and writing the narrative report on the design approach and key highlights.

Option 2: Prescriptive—ASHRAE Advanced Energy Design Guides (AEDG)

Submitted by on
  • Read more about Option 2: Prescriptive—ASHRAE Advanced Energy Design Guides (AEDG)

Option 2: Prescriptive—ASHRAE Advanced Energy Design Guides (AEDG)

It is common for the LEED reviewers to make requests for more information. Go along with the process—it doesn’t mean that you’ve lost the credit. Provide as much information for LEED Online submittal as requested and possible.

Submitted by on
  • Read more about It is common for the LEED reviewers to make requests for more information. Go along with the process—it doesn’t mean that you’ve lost the credit. Provide as much information for LEED Online submittal as requested and possible.

It is common for the LEED reviewers to make requests for more information. Go along with the process—it doesn’t mean that you’ve lost the credit. Provide as much information for LEED Online submittal as requested and possible.

Include supporting documents like equipment cut sheets, specifications and equipment schedules to demonstrate all energy efficiency measures claimed in the building.

Submitted by on
  • Read more about Include supporting documents like equipment cut sheets, specifications and equipment schedules to demonstrate all energy efficiency measures claimed in the building.

Include supporting documents like equipment cut sheets, specifications and equipment schedules to demonstrate all energy efficiency measures claimed in the building.

Upon finalizing of the design, the responsible party or energy modeler completes the LEED Online submittal with building design inputs and a PRM result energy summary. 

Submitted by on
  • Read more about Upon finalizing of the design, the responsible party or energy modeler completes the LEED Online submittal with building design inputs and a PRM result energy summary. 

Upon finalizing of the design, the responsible party or energy modeler completes the LEED Online submittal with building design inputs and a PRM result energy summary. 

The energy modeler should ensure that any final design changes have been incorporated into the updated model.

Submitted by on
  • Read more about The energy modeler should ensure that any final design changes have been incorporated into the updated model.

The energy modeler should ensure that any final design changes have been incorporated into the updated model.

Although EAc1 is a design phase submittal, it may make sense to submit the credit after construction for LEED certification to take into account any final design changes.

 

Submitted by on
  • Read more about Although EAc1 is a design phase submittal, it may make sense to submit the credit after construction for LEED certification to take into account any final design changes.

 

Although EAc1 is a design phase submittal, it may make sense to submit the credit after construction for LEED certification to take into account any final design changes.

 

Option 1: Whole Building Energy Simulation

Submitted by on
  • Read more about Option 1: Whole Building Energy Simulation

Option 1: Whole Building Energy Simulation

Subcontractors may attempt to add a premium during the bidding process for any unusual or unknown materials or practices, so inform your construction bidders of any atypical design systems at the pre-bid meeting.

Submitted by on
  • Read more about Subcontractors may attempt to add a premium during the bidding process for any unusual or unknown materials or practices, so inform your construction bidders of any atypical design systems at the pre-bid meeting.

Subcontractors may attempt to add a premium during the bidding process for any unusual or unknown materials or practices, so inform your construction bidders of any atypical design systems at the pre-bid meeting.

Emphasize team interaction and construction involvement when defining the project scope with key design team members. Contractor and designer meetings can help ensure correct construction practices and avoid high change-order costs for the owner.

Submitted by on
  • Read more about Emphasize team interaction and construction involvement when defining the project scope with key design team members. Contractor and designer meetings can help ensure correct construction practices and avoid high change-order costs for the owner.

Emphasize team interaction and construction involvement when defining the project scope with key design team members. Contractor and designer meetings can help ensure correct construction practices and avoid high change-order costs for the owner.

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 1204
  • Page 1205
  • Page 1206
  • Page 1207
  • Current page 1208
  • Page 1209
  • Page 1210
  • Page 1211
  • Page 1212
  • …
  • Next page Next ›
  • Last page Last »
Subscribe to
logo-footer
Footer
  • Contact us
  • BuildingGreen
  • Jobs at BuildingGreen
  • Terms & Conditions
  • Privacy Policy

© 2026 BuildingGreen, Inc. All rights reserved except where noted.

Reseau Sociaux