If applicable, your M&V plan should specify submetering sensor locations, sensors requiring trending, sampling rates, required energy model outputs, and how measured data will be compared to the energy model. Also include how loads are arranged and gr

If applicable, your M&V plan should specify submetering sensor locations, sensors requiring trending, sampling rates, required energy model outputs, and how measured data will be compared to the energy model. Also include how loads are arranged and grouped in electric panels. (It is best, for example, not to mix power, lighting, and HVAC equipment loads within individual panels.) 

The owner’s goals and IPMVP guidelines should drive your M&V plan, which should specify the systems to be submetered, those being spot-metered, and how you will accomplish this. Your plan also explains energy and water conservation measures that will

The owner’s goals and IPMVP guidelines should drive your M&V plan, which should specify the systems to be submetered, those being spot-metered, and how you will accomplish this. Your plan also explains energy and water conservation measures that will be implemented, how the energy end-use will be predicted and measured, and how the M&V information will be used, for example, to adjust building operations to reduce energy use.