If applicable, your M&V plan should specify submetering sensor locations, sensors requiring trending, sampling rates, required energy model outputs, and how measured data will be compared to the energy model. Also include how loads are arranged and grouped in electric panels. (It is best, for example, not to mix power, lighting, and HVAC equipment loads within individual panels.)
Credits:
Project phase:
Credit tip type: