Introduce your M&V program into the design early in the process, because it can affect the design of the mechanical and electrical systems. There is also inherent value in having your design teams think about how the building will operate. For example

Introduce your M&V program into the design early in the process, because it can affect the design of the mechanical and electrical systems. There is also inherent value in having your design teams think about how the building will operate. For example, if the architect knows that certain spaces will only be operated during the nighttime then they might not want to include daylight sensors. 

The M&V plan  (written for tenant use) for EAc5.2 does not need to be as detailed (or as building- or space-specific) as those written for EAc5.1 or LEED-NC EAc5. The plan for this credit is designed to inform tenants about M&V, the building,

The M&V plan  (written for tenant use) for EAc5.2 does not need to be as detailed (or as building- or space-specific) as those written for LEED-NC EAc5. The plan for this credit is designed to inform tenants about M&V, the building, its metering system, connecting to it to submeter their space, and a process for corrective action if the results of metering differ from the anticipated energy usage.

Determine the best infrastructure for a metering network. The system must be installed in a central location and have the capability to expand to metering tenant spaces. Although for this credit you do not actually have to meter tenant spaces, you do need

Determine the best infrastructure for a metering network. The system must be installed in a central location and have the capability to expand to metering tenant spaces. Although for this credit you do not actually have to meter tenant spaces, you do need to provide the means for tenants to connect to the system. You’ll also need to include a section in the M&V plan on developing corrective actions if the measurements of tenants’ actual energy use differ from those predicted.