The cost of M&V can vary significantly from one project to another. You’ll need to get project-specific bids based on your individual design needs. Accuracy and cost of M&V plans are influenced by the following: level of detail and effort ass

The cost of M&V can vary significantly from one project to another. You’ll need to get project-specific bids based on your individual design needs. Accuracy and cost of M&V plans are influenced by the following: 

  • level of detail and effort associated with verifying post-construction conditions;
  • number and types of metering points;
  • duration and accuracy of metering activities;
  • number and complexity of dependent and independent variables that must be measured or determined on an ongoing basis;
  • availability of existing data collection systems, such as energy management;
  • and the level of precision designed and specified into the system, and your confidence in the data analysis.