Arrange a pre-bid or pre-installation training session to be given by the controls manufacturer to the contractor.
Arrange a pre-bid or pre-installation training session to be given by the controls manufacturer to the contractor.
Arrange a pre-bid or pre-installation training session to be given by the controls manufacturer to the contractor.
In the lighting controls specification, clarify who is responsible for sensor calibration, contractor training, owner/facilities training, and commissioning/verification.
To show compliance with daylight controls for daylit areas, use a diagram or plan that demonstrates the location of sensors that are within 15 feet of daylight openings and indicates which lights are controlled by each sensor.
Complete your documentation in LEED Online. This includes filling out a table with all of the lighting zones in the project and their corresponding sensors and lighting loads. Also upload a floor plan indicating lighting control zones showing each control device and the lighting equipment it controls. Remember to indicate which zones are regularly occupied and to include a scale.
Include in your lighting and electrical layout the location of sensors, connected lights, and appropriate wiring. Include a detailed control schedule in your drawings and specifications.
All Strategies
Select the best type of sensor for each occupied space.
To earn an Exemplary Performance point via IDc1, add sensors to increase the percentage connected to the lighting load to 95%.
Calculate the total connected power load and the power load connected to controls to make sure that occupancy sensors are connected to 75% of the load.
Strategy 3: Occupancy sensors for 75% of lighting load