NC-v4 LTc3:High priority site

Above ground storage tanks

A project I am working on had (QTY: 27) above ground storage tanks removed from the site. This work was overseen by a 3rd party consultant, permitted by the local AHJ, and registered with the DEP. No soil testing was performed since all the tanks were above ground. No ESAs were performed. I want to use the closure report to document Option 3 for brownfield remediation. Has anyone successfully done this before?