If any systems do not meet the required outside airflow during the initial testing the following actions should be taken: If the system (damper) set points for the worst-case condition can be modified to supply sufficient outside air to meet the minimum outdoor air requirements, the team must do so. If the system is incapable of providing enough outside air to meet the minimum requirements, the prerequisite will not be met. That said, a pilot Alternative Compliance Path may be applicable in this situation. Teams should contact GBCI to discuss.
Question
<p>What if our systems do not meet the required outside air when systems are tested at worst-case conditions?</p>