Is it possible to have electric charging station out of the Leed Boundary ? This secundary parking lot, where the charging stations are, provides service to the whole project.
Forum discussion
Hi !
Leed v4:
Is it possible to have electric charging station out of the Leed Boundary ? This secundary parking lot, where the charging stations are, provides service to the whole project.
LEEDuser is supported by our premium members, not by advertisers.
Go premium forTo post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.
If our garage has multiple levels of parking, how do I select “preferred” spaces?
Can my EV charging stations be used as my preferred spaces for green vehicles?
Do the alternative fueling stations need to be in a preferred location?
What if my ESVE manufacturer does not offer a demand-response or time-of-use pricing option?
Can I install manufacturer-specific ESVE equipment? For example, Tesla EV charging stations?
Afogreen Build
www.afogreenbuild.comGreen Building Consultant
247 thumbs up
September 13, 2021 - 2:58 am
Hi Jorge,
As stated on the web page about MPR v4 here: https://www.usgbc.org/credits/new-construction-core-and-shell-schools-new-construction-retail-new-construction-data-3?return=/credits/new-construction/v4/minimum-program-requirements
Facilities (such as parking lots, bicycle storage, shower/changing facilities, and/or on-site renewable energy) that are outside of the LEED project boundary may be included in certain prerequisites and credits if they directly serve the LEED project and are not double-counted for other LEED projects. The project team must also have permission to use these facilities.
Best regards,
Afogreen Build