April 6, 2018 Update:

In Table 5, for Insulation (thermal and acoustic), revise the first sentence in the Includes column so it reads: "Includes the following, if inside the building waterproofing membrane." Revise the first sentence in the Exceptions column so it reads "Insulation on interior or exterior of HVAC ductwork and insulation on any piping may be excluded (because of lack of modeling scenarios)." Also, revise the first sentence in the Calculations column so it reads "Total area of insulation is based on installed planar areas of each insulation type."

April 5, 2016 Entry:

In Table 5, for Insulation (thermal and acoustic), revise the first sentence in the Includes column so it reads: "Includes the following, if inside the building waterproofing membrane." Also revise the first sentence in the Calculations column so it reads "Total area of insulation is based on installed planar areas of each insulation type."