Forum discussion

NC-v4 EAp2:Minimum energy performance

Outdoor Ice Rink Energy Performance

We are looking at LEED for a multi-purpose sports facility with indoor space and an outdoor ice rink that is not enclosed.  Would the outdoor ice rink factor into any energy performance criteria?  Is the energy performance of chilling the ice excluded as a process load not covered by any tables?

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Wed, 03/11/2020 - 17:40

The outdoor rink must be included in the models identically as a process load.

Wed, 03/11/2020 - 19:31

Marcus,  this makes sense.  Thank you for being so generous with your advice.  Cheers to you.

Wed, 03/11/2020 - 20:43

My pleasure Ralph! you can, of course, claim saving through an exceptional calculation for something like a higher efficiency chiller or other strategies.

Wed, 03/11/2020 - 21:16

Ah, good point.  I had not considered that.  Thanks again.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.