We have delegated design of the irrigation system to the contractor but are pursuing the split review process. If the irrigation design is not completed until construction, when I submit the design review, can I exclude the outdoor water use prerequisite and include it as part of the construction review? I know you can do that with design credits, but this is a prerequisite.