Hi,

I am modeling a C&S building for the Construction Submittal, and I have to adjust the Design Submittal Energy Model because the Owner change the brand of the VRF systems.

The C&S equipment is installed, but the systems for the Tenant Spaces are not installed yet, they are stored waiting for the Tenant fit outs.

Which would be the right way to model this situation?

1. I use the installed equipment data for the Energy Modeling.

2. For the spaces that do not have the installation but they are assigned the HVAC systems, I use these data for the energy modeling. Indicating in the drasings that the space has the specific HVAC equipment but they are not installed yet.

Thank you very much!

Paula