FAQs about EAp2 :

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

View answers »

Forum discussion

CS-2009 EAp2:Minimum Energy Performance

Installed and not Installed HVAC

Hi,

I am modeling a C&S building for the Construction Submittal, and I have to adjust the Design Submittal Energy Model because the Owner change the brand of the VRF systems.

The C&S equipment is installed, but the systems for the Tenant Spaces are not installed yet, they are stored waiting for the Tenant fit outs.

Which would be the right way to model this situation?

1. I use the installed equipment data for the Energy Modeling.

2. For the spaces that do not have the installation but they are assigned the HVAC systems, I use these data for the energy modeling. Indicating in the drasings that the space has the specific HVAC equipment but they are not installed yet.

Thank you very much!

Paula

 

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Fri, 01/03/2020 - 21:54

If all the systems have been designed and purchased but not installed you should be able to model the proposed as designed.

Mon, 01/06/2020 - 11:13

Great, thank you Marcus!

Tue, 01/07/2020 - 17:01

Hello Paula, are you including the HVAC systems in the tenant space in the C&S scope of work? Best Regards

Wed, 01/08/2020 - 11:10

Hello Francesco, yes, I am including HVAC systems in tenant spaces, and as I mentioned before, the systems have been purchased by the Building Owner, but they have not been installed. They are stored wainting for the tenants to install them. So, what do I use to model the Proposed Building for the tenant spaces, the Project systems or the systems that have been purchased?. Thank you!

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.