Forum discussion

NC-v4.1 LTc8:Electric Vehicles

NC-v4.1 LTc8: Electric Vehicles

Hello, I have a question regarding the LTc8 Electric Vehicles credit.  If our project only requires 2 parking spaces to have ESVE installed, does that mean each parking space must have an independent charging station? Or can 1 station be installed with the capacity to handle both parking spaces?

Thanks,

Brian

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Wed, 01/15/2020 - 13:13

Hello Brian,  This should be fine considering both the parking spaces are adjacent to each other. You can include brief description explaining your case. Make sure proper signage has been provided for EVSE parking spaces and charging station meets the requirement. Manufacturer's documentation should demonstrate that the charging equipment has a charging capacity of at least Level 2 (208-240 volts), meets the relevant regional or local standard for electrical connectors, and is networked or internet addressable. Hope this helps!   

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.