Hi all,
We have an office building with stormwater collector targeting use greywater at car washing station within the building. Can this comply with harvesting water for custodial use as it stays in SSc6.1?
Thanks!
What performance threshold do I need to achieve for an Exemplary Performance point?
Why do the requirements focus on 1-year and 2-year, 24-hour storms?
How can green roofs count as a stormwater control measure?
I have 100-year data—how do I convert to 2-year?
Are there special considerations for international projects?
Forum discussion
NC-2009 SSc6.1:Stormwater Design—Quantity Control
Hi all,
We have an office building with stormwater collector targeting use greywater at car washing station within the building. Can this comply with harvesting water for custodial use as it stays in SSc6.1?
Thanks!
LEEDuser is supported by our premium members, not by advertisers.
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.