Water Efficiency in CS

We are doing a large LEED-CS office building. The owner will provide 2 large restrooms with extremely low water fixtures for tenant employees on each floor. In v4, it seems like regardless of this, we have to count all tenant space users as using "baseline" fixtures; a huge "ding".  I recall reading somewhere that in LEED-CS v4.1 you would not have to do that. and that's partly why you can only achieve 4 points. 

Can someone straighten me out on this? 

Thanks!

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Thu, 08/15/2019 - 15:07

  Hi Susan,  I believe this requirement is still in v4.1. Although C&S projects can only get 4 points for indoor water use reduction, there are additional points to be had under Outdoor Water Use Reduction and Cooling Tower and Process Water Use. It looks like GBCI redistributed the points to better align with C&S project goals.  For C&S projects, we go about this credit by including a LEED Lease Addendum with flow/flush rates called out. That way we can calculate the tenant water usage using the fixtures agreed to rather than the baseline. Hope this helps!  

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.