Hi there,

We are working on a new science lab on a university campus. The campus already has 2700 parking spots, with the current parking demand being only 2100 or so. Our project "requires" 300 spaces; this is to be included in the existing parking availability, so that the new remaining campus parking capacity for future buildings would be 300 spaces (2700-2100-300). 

The parking is located in big lots that won't be specifically demarcated for this building. 

Should the credit requirements be applied to all 2700 spots since "total vehicle parking spaces must include all new and existing off-street parking spaces leased or owned by the project, including any parking allocated to the project that is outside the project?" 

Or is it fair to say that it should only apply to the 300 spaces that have been declared as "required" for the project, although not specifically marked?

Thank you for your help.