Campus project with central plants serving several buildings

Hi All,

Our project composed of several buildings which share a group of main central plants (including several chillers and cooling towers).

Does below approach correct?

Baseline: simulate the whole campus with separated meters for each building (i.e. each certificate) and choose the correct baseline system according to Table 3.1.1A for each building.

Design: simulate the whole campus with the designed plants and use separated meters to capture the energy use of each building.

Thanks!

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Thu, 04/11/2019 - 12:19

The LEED Reference Guide contains very specific guidance for how to model projects associated with a central plant. Your approach is not correct.