FAQs about EAp2 :

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

Energy sourse - pellets

Greetings,

Our project has as an energy source pellets – type agricultural crop or waste (sunflower waste).

Regarding the data entry in MEPC (Minimum Energy Performance Calculator), should we enter this energy source as “wood” since there is no “pellets” options.

The other question is related to the price of the energy source. The pellets price is different than the fuel oil (diesel) price, which will be applied to the Baseline model. The question is:

Which price should be entered in MEPC, so that the price difference to be within the required tolerance, or will it be allowed in such cases to apply different energy costs.

Your support is highly appreciated.

Thanks

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Mon, 02/25/2019 - 17:32

First make sure you check the interpretations about whether this qualifies as a renewable. There are some restrictions relative to proximity and contract term (LIs 1789 and 5332). Based on the exception to G2.4 it appears that you can have a different energy cost.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.