FAQs about EAp2 :

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

For a project outside the U.S., how do I determine the climate zone?

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

LEED NC 2009 Documentation

Hello,

For a LEED NC project, should construction EN documents be the baseline for input of all energy model inputs given that the model is best to be completed during the design phase of the project? And two, in general how much should data from approved cut-sheets, as shop drawing or as-builds be used as part of the prereq and credit supporting documentation submittal?

Am just overwhelmed from all these sources of data, and would like understand what best practices are recommended by LEED or have been used in other projects. Thank you for your help

1

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Tue, 02/05/2019 - 17:09

In general no matter when you complete the energy model it should be based on the final construction. This is the most accurate prediction and therefore the most accurate assessment of energy savings. That said there are some issues with this in LEED. If you do a combined submission the final model should be based on the final construction, not the final design. If you do a split submission your models are based on the design documents. Technically you are supposed to change the models if something happened during construction that would change the modeling results to any significant degree. However, this is not really enforced so most projects do their models based on the design documents and then do not update them based on changes during construction. Best practice would be to model the project as accurately as possible based on the final construction which is not really required by LEED.

Tue, 02/05/2019 - 18:00

This is super helpful Marcus, thank you. Given our combined submission, it makes sense that am running through this process of changing the model to reflect field conditions during construction. I'd be able to share with team as well the implications time demand, details of updating model as the project progresses with combined submission.  This will help with early decisions on modeling requirements/needs and project registration/submission choices. 

Tue, 02/05/2019 - 18:26

In LEED v4 there are some early design phase energy analysis requirements that are not required in LEED 2009. Here is a tip sheet on the subject that was recently posted in LEED User - https://leeduser.buildinggreen.com/tipsheet/design-phase-energy-modeling-leed 

Tue, 02/05/2019 - 19:01

https://leeduser.buildinggreen.com/tipsheet/design-phase-energy-modeling-leed

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.