Hello, is exterior lighting on a roof (terrace) regulated by ASHRAE 90.1-2007? Or shall it be modelled in the same way (same power and same schedules) in the proposed and in the baseline model?
Can SHGC be higher in the proposed than in the baseline model?
Our process load is higher than 25%. Do we have to justify that?
Do I need to justify the electrical and fuel rates I am using in my model?
Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?
Can mezzanines open to floors below be excluded from the energy model?
How do I provide a zip code for an international location?
For a project outside the U.S., how do I determine the climate zone?
For a project outside the U.S., how do I determine the Target Finder score?
Do hotel rooms need automatic light shut-off control?
How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?
The Section 9 space-by-space method does not include residential space types. What should I use?
Can the Passive House Planning Package (PHPP) be used to energy model for LEED?
A portion of our building envelope is historic. Can we exclude it from our model?
Which baseline HVAC system do I use if my building has no heating or air conditioning?
Forum discussion
CS-2009 EAp2:Minimum Energy Performance
Hello, is exterior lighting on a roof (terrace) regulated by ASHRAE 90.1-2007? Or shall it be modelled in the same way (same power and same schedules) in the proposed and in the baseline model?
LEEDuser is supported by our premium members, not by advertisers.
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.