FAQs about EAp2 :

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

Energy source - pallets

Greetings

We have a project where the heating plant consists of boilers using wooden pallets as an energy source. They’ll serve Heating and DHW on 100%. The pallets will be purchased from somewhere off-side.

We’ve been checking the ACP EApc95 v3-LEED 2009 where it has been mentioned that there is a possibility to obtain up to 26 points.

We are in possession of the latest update of ISO Standard 16246:2013, which is now named as ISO 52000-1:2017.

We’ve also downloaded the spreadsheet EApc95 Energy Metric ACP.

The questions still are:

  1. Is there some explanations or instructions on how to fill-in this spreadsheet.

  2. How the possible points are to be evaluated, is there some table?

  3. Since the energy rates in Proposed and Baseline are supposed to be equal, how practically to get any advantages if the pallets appear cheaper than the diesel oil, which is the traditional energy source in this region.

Any advice/guidance in these directions will be highly appreciated.

Thanks

 

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Mon, 04/23/2018 - 16:34

1. I don't know of any other instructions. It looks pretty self-explanatory to me. 2. You use the same percentage based table as you would use for cost under EAc1. 3. That comparison is not allowed in LEED under any scenario. Both the baseline and proposed need to use the same fuel. You may get a somewhat different percentage savings from some of the other metrics in EApc95. However, your reasoning for using a different metric than cost should not be solely based on the fact that you get a better percent savings than if you used cost.

Fri, 04/27/2018 - 07:09

Hi Marcus, Thanks for the reply. The reason for questioning about filling-in the EApc 95 calculator are:
  • Cost – it’s clear that the energy cost will be identical, but which one- the pellete’s cost or the diesel’s cost.
  • Source-to-site ratio – should we enter here the respective value for each separate energy source and if it should be entered identical – which one to enter
  • Greenhouse gas emission factors – again, should we enter here the respective value for each separate energy source and if it should be entered identical – which one to enter
Our question might appear kind of foolish, but we’d like to avoid any eventual misinterpretation while pursuing this ACP. Your opinion on the matter is highly appreciated. Thanks.

Fri, 04/27/2018 - 14:12

Pallet cost. This ratio varies from fuel source to fuel source. The one with the biggest disparity is electricity. Most other have little to no difference between the two. For each fuel source.

Fri, 04/27/2018 - 14:29

Thanks a lot, Now is clear