Hi everyone
Has any of you used the http://www.ghgprotocol.org/calculation-tools to determine the quantity of mtCO2e needed to offset ?
The reference guide states that international projects may use WRI-WBCSD Greehouse Gas Protocol Standards but doesn't explain the documentation required to justify the fuel mix chosen. For Switzerland for instance the current mix is roughly 60% hydraulic and 30% nuclear. Neither of those appear as a fuel mix and depending on the fuel mix selected, the mtCO2e vary drastically (for 1000 MWh of electricity between 30 et 400).
Any help would be greatly appreciated!
Michaël Briffaz
Energy Management SAJanuary 31, 2024 - 8:52 am
Hey,
It is an old post but I am interested in your feedback on how you handle it in the end and what was GBCI feedback ?
Thanks in advanced