Dear all,
Hope you are doing well.
This is the first time I am working on existing factory, so I have couple question which I am not sure these questions belong to which credit/ prerequisite. Please correct me if I am wrong.
The questions are:
1. Do LEED requires all buildings must have fully mechanically-ventilated spaces (except for toilet blocks)?
2. Water cooling systems in sheds with 50m+ dimension do not comply with LEED. Is it correct?
3. The project have 12 buildings, but owner just want to do LEED EBOM for 2 buildings among 12. Is it possible to get LEED only for these 2 buildings?
Thank you for your time and support.
I look forward to hearing from you.