Dear all,

Hope you are doing well.

This is the first time I am working on existing factory, so I have couple question which I am not sure these questions belong to which credit/ prerequisite. Please correct me if I am wrong.

The questions are:

1. Do LEED requires all buildings must have fully mechanically-ventilated spaces (except for toilet blocks)?

2. Water cooling systems in sheds with 50m+ dimension do not comply with LEED. Is it correct?

3. The project have 12 buildings, but owner just want to do LEED EBOM for 2 buildings among 12. Is it possible to get LEED only for these 2 buildings?

Thank you for your time and support. 