Hello all,
our project is a Data Center that every single part of it will be metered. Each rack will have two meters while also every electrical panel will have each own meter. If we add up all of the meters the yielded sum equals to roughly 1,600 meters for the whole building. Nonetheless, the Data Rooms are being repeated which means that Data Room 3 will have the same number of meters as Data Room 1. Should we still mention all of the meters?
Marcus Sheffer
LEED Fellow7group / Energy Opportunities
LEEDuser Expert
5909 thumbs up
August 10, 2017 - 12:04 pm
The documentation requirements are containing the the Reference Guide and within the credit form in LEED Online. You can download sample forms here - https://www.usgbc.org/sampleforms?keys=leed+nd
If the form asks for all the meters you should provide it.