I am somewhat confused comparing the requirements of C&S and New Construction. In C&S requirements there is no statement about 10% of energy end use; to me that means advanced meters only for energy sources at site border. Is that correct? For tenants only meters are required, not "advanced" meters. That means to me the requirements like 1 hour interval etc. do not apply; tenant meters could as well have 1 year intervals. Is that correct? For both base building and tenants it would not be necessary to determine the 10% energy end uses; but that step is included in step-by-step guidance, also in the online access. If this is true I think there is no way to calculate base building systems' energy use, as there is whole building data in 1 hour intervals and tenant data (that would be deducted to obtain base building data) in other intervals. Can someone shed some light on this? If I understand it correctly the credit is much easier for C&S.
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.