Greetings, The following issue is somehow not clear and any support is highly appreciated. The project belongs to system 7 (LEEDv2009) and has to be modeled with one AHU system per floor. In one of the floors there is a conference room, which is modeled as DCV. In the Proposed (i.e. original project design) this room is assigned to a separate AHU serving only this room. As for the Baseline - should this room also be assigned to a separate AHU or the AHU serving for the whole floor should be entered in MEPCalc as DCV system. We've been thinking to assign this room to a System 3, but it is mentioned that it refers to public buildings. Is it possible in this case to assign this conference room to a single System 3. This approach however is explained in version 2013, which is not the version we've been registered, so any advice is more than welcome. Thanks.
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.