Project boundary dilemma: City stormwater permit vs LEED area

Hi! Our site is located in Minneapolis and is a rather complex historic urban infill site. Three quarters of a former industrial site's entire city block was redeveloped by our client. The City of Minneapolis required our client to perform a stormwater analysis of the entire 3/4s of the block, which is reflected in our stormwater calculations. However, nearly half of this area (the 3/4s block) is outside the LEED project boundary, with buildings and grounds that are no longer related to the client (in ownership or mechanical/electrical equipment). We received our initial review and were awarded the stormwater credit based on large stormwater calculations....but we are unsure as to whether the stormwater calc area needs to conform with the actual LEED boundary, which is smaller? We have been asked to clarify the boundary. Thanks for your advice.

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Fri, 02/10/2017 - 15:59

The MPRs state that the LEED Project Boundary must be treated consistently throughout the project. Am I reading this correctly that your SS stormwater credit(s) were approved by GBCI during review but are based on area outside of your LEED Project Boundary?

Fri, 05/19/2017 - 22:07

The credit allows for stormwater to be managed outside the LEED boundary as long as the system meets the LEED requirements for ALL drainage areas that it serves.