Hello,
I am working on a Project that wants to claim all the available points on EA-c2. But they don´t have the space needed to place all the solar panels inside the LEED boundary.
The owner has another parcel about 0.06 miles from the building and he is planning to install the panels on this parcel. The panels will provide energy only to this Project.
Will this be acceptable to reach the credit?,
Do we have to include this other parcel into the LEED boundary for this option to be accepted?
Thank you!