As per DES – Performance path option 1, the DES has to be modeled as purchased energy in both baseline and proposed case energy models. For proposed model, the pumps which are downstream equipment within the LEED boundary shall be modeled with chilled water meter. So, how to model the pumps for purchased energy in baseline case?
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.