Forum discussion

NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roof

Are basement walls included in envelope calculations

I understand the floor slab of basements is allowed to be included; what about the envelope? I would think they should be allowable, as they provide a physical barrier to the elements, but I'm looking for a second opinion. Thanks.

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Wed, 01/18/2017 - 00:00

Hi Stacey, Yes all existing envelop materials are to be included. See FAQ above.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.