Hello!
I am constructing a building model which spaces are half offices, half laboratories.
The HVAC system chosen is system 5 (packaged VAV with reheat) for all building, since it is considered a single thermal block.
In order to meet G3.1.1 c., is it necessary to model laboratories area itself with an independent system 5 or 7? Or should I model the entire building with a single HVAC (system 5)?
Thanks
Marcus Sheffer
LEED Fellow7group / Energy Opportunities
LEEDuser Expert
5909 thumbs up
November 30, 2016 - 10:51 am
Any applicable exceptions to G3.1.1 must be included in the baseline model.