Hi All, We have a campus with a substation on-site (on owner's property) that will be owned by the local utility. The Owner would like to tie in the power generated by an on-site solar energy production system at the transformer yard as the power is coming into the facility. Does anyone have experience with such a strategy? On the face of it, this seems to be unacceptable, but at the same time, it seems to meet the intent and spirit of the requirements and is therefore a candidate for a CIR request. Any thoughts?