FAQs about EAp2 :

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

Energy Modeling

Hi Marcus, I am doing energy modelling for a Bank building. Total Building Area is 55,600 SFT. Please comments on bellow points. 1.In Baseline model i am using only one LPD value EXCEPT(meeting room,restroom,electrical room, corridor and lobby ) as per ASHARE 90.1.2010 Table 9.6.1 "banking activity area 1.38 w/sft" for all offices(semi-enclosed or closed) spaces. Its acceptable or not. 2. HVAC system consist two types of systems. One is Chiller system for all floors except Basement. In Basement split system is for conditioning.Basement total area is 15000 sft and 40,600 sft area served by chiller.Now please guide me how to select the Baseline system for HVAC system. Thank you

1

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Fri, 06/17/2016 - 13:48

1. I don't think so. That only covers the area where the tellers work, not the offices. 2. Not enough information. What is the heating fuel and how many floors in the building?

Sat, 06/18/2016 - 16:05

Many Many Thanks. 1. Sounds good 2. Basement and four floors.

Sun, 06/19/2016 - 20:49

It is a system #5 or #6 depending on the heating fuel.

Thu, 06/23/2016 - 09:42

Heating fuel is Electric Resistance. 1.Now heating fuel is electric resistance so i select system 6 for Baseline model for chiller system. But Basement HVAC system consist on Split AC. Which HVAC system is select for Basement ?

Thu, 06/23/2016 - 15:16

Electricity is the default, so the same system. You only select a different baseline system only if one the exceptions to G3.1.1 applies.

Thu, 06/23/2016 - 15:26

Thank you so much

Add new comment