FAQs about EAp2 :

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

Renewable Energy in Template EAp2 (Healthcare)

Hello. I´m modelling a new construction Healthcare building. To insert the results of renewable energy generation in LEED EAp2 Template, exit 3 options: - Automatic Cost Calculation - Manual Cost Input - Energy Model Includes Renewables I have modeled renewable energy (PV + Solar thermal) directly in my energy model (EnergyPlus), but the results of generation energy are not subtracted of facility energy demanded. So, when i choose option 1 (Automatic Cost Calculation) in LEED EAp2 Template, the renewable energy generated is subtracted from results of building energy consumption. On the other hand, in EAc2 LEED Template, the renewable energy generation is specified and the LEED points are awarded. As I understood, if you attempte EAp2 (EAc1) with Renewable energy included, you can´t attempte EAc2. Is it correct? What option i have to select in EAp2 LEED Template, related with renewable energy? To attempte EAc2 too. Thanks

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Wed, 05/18/2016 - 14:20

That is not correct. The renewables do contribute toward EAc2 no matter what option you select in the form. If the information is not automatically transferring to the EAc2 form you can always upload a narrative and calculations explaining the situation and the appropriate points will be awarded. It sounds like the automatic cost calculation is working so I would do that.

Wed, 05/18/2016 - 14:31

Thanks Marcus. Then, renewable energy grants points in both, EAc1 and EAc2. Or these only can grant points in a credit? Thanks

Wed, 05/18/2016 - 14:32

Renewable energy contributes toward the points in EAc1 and EAc2.

Add new comment