FAQs about EAp2 :

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

For a project outside the U.S., how do I determine the climate zone?

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

View answers »

Forum discussion

CS-2009 EAp2:Minimum Energy Performance

Data Center Modeling - LEED CS version 2009

Dear fellow modelers, I have a query regarding modeling and saving percentage calculation for datacenter buildings for LEED CS -2009. I have modeled the datacenter building with its actual process load and actual parameters/ values to cool building and process equipment’s. Now for considering the savings, I need suggestion from you, that what should be the actual way of considering its savings as per LEED, and any exceptional calculations required. 1. Considering savings for full building including every consumption (process consumption)– In this case project is achieving 2% saving, as process consumption is very high. 2. Considering savings for building only (excluding both the process electrical energy consumption and HVAC energy consumption to cool process equipment/data center equipment) – in this case project is achieving around 8% savings. 3. Considering savings for building (excluding the process electrical energy consumption, but including the HVAC energy consumption to cool data center process equipment’s, and general space both) – in this case project is achieving around 33% savings, as HVAC systems are very efficient (HVAC to cool spaces, and HVAC to cool datacenter equipment’s both are very efficient). It’d be great to have your suggestions on this. Thanks, Anurag Joshi

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Mon, 04/25/2016 - 19:09

1. It needs to be the full consumption. 2. Not allowed. 3. Not allowed. Are you using the calculator? http://www.usgbc.org/resources/minimum-energy-performance-data-center-calculator

Wed, 05/04/2016 - 15:35

Dear Marcus, Thanks for your reply. Just guide me a thing more. The Baseline case for this climate zone says to install economizer, so shall this economizer unit need to be installed on computer room HVAC units as well?? They are just cooling the process equipment of data centers.

Wed, 05/04/2016 - 16:24

Any equipment that is 100% for a process is not regulated and must be modeled identically in both models based on the proposed design. An example is a data center might be a chilled water system that directly cools the equipment and does not necessarily condition the air around the equipment. If the cooling equipment cools the equipment by cooling the air around it you are in a grey area because that equipment typically will be providing conditioning for the people in the space as well. I don't see any applicable exceptions for data centers in 90.1-2007. 90.1-2013 does more explicitly address economizers in computer rooms so you could try to make the case for an exception using that version of the standard.

Add new comment