Our project is the major renovation of an existing building. We have added 2 new floors on the top.

1. Because of the top two new floors, does the baseline building need to be rotated as a whole? Or can we use the existing orientation for our baseline model (including 2 new floors)?

2. Does this mean that the existing floor to be renovated will use the pre-renovated envelope for the baseline but the top two new floors will use ASHRAE section 5 as a baseline? Am I correct?

Thanks