Dear Al:- Our project have 50 kWp Grid connected solar panel system with out battery back up. the project is individual and the solar panel is only for this factory alone the factory operate 240 days per year but we get energy from solar panel for 365 days so we connect our solar power to Govt Electric grid so the energy from solar is sent to govt via electric grid (with sub Electricity meter) when the factory not operating, then electricity bill generated automatically subtract the electrical energy get from factory solar panel Now the issue is How much electricity cost we count towards renewable energy cost options are (the solar panel supplier gives the annual electricity production by 50kWp solar panel) 1.Entire electricity produced by solar panel In year 2.Electricity produced in factory operating time (240 days)
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.