This is a 70,000 sf Aeronautical Maintenance Workshop in Colombia with the following features: -The space is 6 meters height. -There are interior walls 5 meter height. Therefore, all the workshop is connected at the top of the space (1 meter) -There are plenty of skylights that provide natural ventilation. -Distances and size of openings meet sections 6.4.1 and 6.4.2 of the Standard ASHRAE 62.1 - 2010. My question is: can I consider it correctly ventilated considering the openings are at the top of the space? We are going to use ASHRAE 62.1-2010 to demonstrate compliance for the whole workshop. Thanks in advance.
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.