FAQs about EAp2 :

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

For a project outside the U.S., how do I determine the climate zone?

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

Airconditioning for process requirement

Hi, We are working on a tablet manufacturing facility which is fully air conditioned (Only cooling, no heating requirement). More than 50% of the areas have RH less than 40% and temperature of 22degC to be maintained . The other 50% of the areas have a temperature requirement of 22degC and RH less than 60% to be maintained. Can we model identical air conditioning in base and proposed case for the areas with RH less than 40% requirement as these areas have AC for process requirement?

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Mon, 11/02/2015 - 14:06

The humidity levels should be modeled identically.

Tue, 11/03/2015 - 05:23

Ok. Thanks for the reply. But can we consider the Air conditioning system identical in base and proposed case as the system is mainly for process load requirement (Humidity levels are low as per process requirement)?

Tue, 11/03/2015 - 14:21

Probably not. You can only consider the entire HVAC system serving an area as process if that system is exclusively design for the process only and not the people in that space. There is potential grey area here so if you want to try it make sure to provide a very thorough explanation and justification to do so.

Add new comment